Bartosz Rentflejsz, home

Case 01 · Flagship

ShiftPilot

AI shift handover manager · Production operations

In factory operations, I kept seeing the handover pulled together from scattered sources at the end of a tired shift. So I built a working prototype around one question: is this handover ready?

ShiftPilot · flagship synthetic demo shift

Day shift · 06:30 to 18:30 · handover due

Is this handover ready?

Not ready3 gaps to close

Missing information, found in the logged events

  • 07:50 Mixer 2 downtimeNo reason code logged
  • 11:15 Near-miss at the crossingNo named investigation owner
  • 15:30 Packing terminal frozeDowntime duration not recorded

Next-shift summaryWaits until the gaps are closed

Manager updateTriggered by the near-miss and a quality holdHuman review

Interactive sketch of ShiftPilot's readiness logic, using events from its synthetic demo scenario. Not a product screenshot; no AI runs here.

Problem
Handover information is scattered across downtime records, boards, briefs, emails and memory. Blockers and open actions get lost at shift change.
My role
Bartosz Rentflejsz, product owner and builder: problem framing from factory operations, scope, AI rules and domain review. Built with AI coding assistants.
Solution
A readiness check before the summary. Fixed, tested rules decide readiness and gaps, not a model.
Evidence
The narrated case-study video below. 100 unit tests, clean typecheck and build.
Status
Working prototype Synthetic data only. No backend, no live AI model.

01 · Problem

Where the handover breaks

The state of a shift lives in the downtime system, on problem boards, in brief meetings, in emails and in the leader's memory. It has to be rebuilt at shift change, when the outgoing team is most tired.

Who it is for
Shift leaders, team leaders and production supervisors
What goes wrong
Incomplete handovers, lost follow-ups, late escalations
Setting
A simulated shift at a UK food production site. Every event is synthetic.

02 · My role

Product owner and builder

The decisive corrections came from my own factory operations experience, not from automated review.

What I did
Problem framing from factory operations, scope, AI rules and domain review. Built with AI coding assistants.
From the floor
Events are logged during the shift, not rebuilt at the end. Status is kept per line, the way responsibility splits. Open issues become watch items for the incoming shift.
A decision it changed
An "area-wide" option was removed: it did not match how responsibilities divide on a real shift.

03 · Solution

Readiness before summary

Not a notes app and not a summary generator. Events are logged during the shift; before it ends, the product shows whether the handover is ready and which information is missing.

ShiftPilot's documented workflow, drawn for this page: logged events feed one readiness check, which produces three outputs. Not a product screenshot.
What it does
Readiness status, Needs Attention, line status, missing information warnings, Shift Leader Briefing, Log Shift Event
AI boundary
No live model in this version: deterministic, unit-tested rules decide readiness and gaps. A future model may structure and phrase, never add facts. Safety, food safety and quality stay with a human.
Built with
React, TypeScript, Vite, Tailwind CSS, Zustand, Vitest

04 · Evidence

The working prototype, on video

100 unit tests across 9 files, clean typecheck and build.

ShiftPilot · case-study video 1:31 · captioned
The working prototype on its synthetic demo shift: an event is logged, readiness drops, each gap is listed with its source, and the next shift gets a summary built only from what was recorded. AI-generated voiceover; script and project by Bartosz Rentflejsz.
Transcript

In factory operations, the handover picture is often scattered across downtime records, boards, briefs, emails and memory. I kept seeing it pulled together at the end of a shift, when people are most tired. So I built ShiftPilot around one question: is this handover ready? Events are logged during the shift, not rebuilt at the end.

One downtime entry, and readiness moves from 77 to 69 per cent. That is not a failure. ShiftPilot has found two details the entry is missing. The blockers view lists every gap, alongside the event it came from. I chose fixed, tested rules for readiness, not a model's guess. Each gap names information a person still has to supply.

The leader flags the issue for the incoming shift, and it becomes an explicit watch item. Some decisions came straight from the floor. I kept status per line, because that is how responsibility really splits. The next shift gets a summary built only from what was recorded. Safety and quality items stay with a person. ShiftPilot flags them, but never changes their status.

What this shows is how I work: start from a real operational problem, keep AI inside clear limits, and build a focused, tested product.

The video and every event in it come from the prototype's synthetic demo shift.

05 · Status

Where it stands

Feature-complete as a portfolio prototype.

Status
Working prototype on synthetic data, 2026. Not enterprise-ready, and presented as such.
Deliberately not built
Backend, login, integrations and a light theme. Each was deferred with a written reason.
Next
A real AI model behind a server-side boundary with cost controls. Planned, not built.

Menu

Emailbartosz.digitalstudio@gmail.com